Centro sportivo Bellè – Parma

Done maintenance involved the installation of new LED projectors at a height of 32 meters for the lighting of the synthetic soccer field used for training and matches of numerous competitive teams including the “PARMA 1903“. The intervention consisted of 3 phases: the first concerned the un-wiring and dismantling of the old lighting fixtures; the second which concerned the installation and connection of the new lighting fixtures and finally the third which concerned the rewiring of the electrical panels with the installation of new certified safety devices.
With a subsequent orientation of the LED bodies using laser technology, the lighting of the playing area was significantly improved and more uniform than before.

Main interventions:

  • Energy upgrading of lighting systems installed at the sports center

Details