Palazzo Ducale – Parma

Done maintenances consisted in the lighting of the entire external perimeter with new LED projectors and the drafting of new back lines for the entire structure; the goal was to make the surrounding area safer in order to bring out the best of the architecture of the building.
The system is controlled by astronomical clocks that regulate its operation based on the sunrise and sunset times set by advanced software calculations.

Illuminazione rotonde

Done maintenances consisted in the installation of new LED projectors with optics dedicated to street lighting. The purpose was to use the supports present by enhancing the street lighting through appropriate lighting calculations, which were then scrupulously verified by our qualified staff.

Centro sportivo Bellè – Parma

Done maintenance involved the installation of new LED projectors at a height of 32 meters for the lighting of the synthetic soccer field used for training and matches of numerous competitive teams including the “PARMA 1903“. The intervention consisted of 3 phases: the first concerned the un-wiring and dismantling of the old lighting fixtures; the second which concerned the installation and connection of the new lighting fixtures and finally the third which concerned the rewiring of the electrical panels with the installation of new certified safety devices.
With a subsequent orientation of the LED bodies using laser technology, the lighting of the playing area was significantly improved and more uniform than before.

Fornovo di Taro

Done maintenances involved the urban and architectural redevelopment of the parish church through the installation of new LED projectors that highlight the structure and indicate the ancient Via Crucis to pilgrims during their pilgrimage. The intervention did not concern only the parish church but also the surrounding areas, creating an evocative setting even in the neighboring streets, combining in a very harmonious and effective way with the existing public lighting.

Illuminazione natalizia – Varese

Done maintenances consisted in the installation of luminous decorations using structures and figures of various types and sizes in the Estensi’s gardens and the palace. Through plays of light and figures, it was possible to create an evocative area of great interest for audiences of all ages.

Campo Sportivo – Roccabianca

Done maintenances involved the installation of new supports and the replacement of discharge headlights with the installation of LED headlights, the replacement of lines and the installation of new panels. The projectors were mounted at a height of 30 meters and, subsequently, they were oriented in the direction of specific points, outlined by an appropriate lighting calculation. We have thus obtained an adequate degree of uniformity and avoided glare and light pollution.

Campo sportivo – San secondo

Done maintenance involved the replacement of discharge headlights with the installation of LED headlights and the replacement of lines with the installation of new panels. The projectors were mounted at a height of 28 meters and, subsequently, they were oriented in the direction of specific points, outlined by an appropriate lighting calculation. We have thus obtained an adequate degree of uniformity and avoided glare and light pollution. Six structures were also mounted on each tower, each of which had 3 independently adjustable 300 W LED modules fixed inside.
The system was also equipped with DALI technology in order to manage the single 300 W module and thus be able to create different scenarios and lighting effects.